The new Gwadar International Airport (NGIA), the $246m greenfield airport being built at an area of 4,300 acres would be operational by September 2023. According to the official source, the passenger terminal building of the project would be completed by June 2023; work related to air traffic control by March 2023, while the overall construction of the airport would be finished before September 2023. The New Gwadar International Airport (NGIA) was being managed and operated by Civil Aviation Authority (CAA). To be owned by a joint venture between Pakistan, Oman, and China, the airport would handle domestic and international operations. The airport development is a part of China-Pakistan Economic Corridor (CPEC) development, which was a cornerstone of China’s One Belt One Road (OBOR) initiative. The biggest in Pakistan and would also become the nation’s second airport capable of handling A380 aircraft upon its commissioning in 2022.
متعلقہ مضامین
-
ریل رش: ایک تلاش برای دستیابی به خاطرات ابدع
-
اسلام کا نام لفظ "سنت" سے آیا ہے۔ عربی میں، فعل "سنہ"
-
کے بانی والد مصطفی کمال اتاترک نے 1924 میں خلافت کو
-
سنت قانونی مسائل کے حل کے لیے حدیث پر انحصار
-
میں غیاث کا لغوی معنی "پیمائش" ہے، قانونی
-
اور موسیقی فن کے لیے سنی کی حمایت کا تعلق مقامی
-
داستان ایک مسلمان دلہن اپنی شادی کے کاغذات پر
-
میثا بونان: یہ ڈیجیٹل گیم چھوٹے اور بڑے کے لیے
-
میٹھا بونان: یہ کیسا اور کیوں ہوا؟
-
میٹھا بونانزا?,?
-
حاتس:
-
الحات اسپن: تقنيات متقدمة في مجال التكنولوجيا